A two stage operation, May 5 and June 23 2001.
Click on photos for larger view; return with your "back" button.
|
|
|
Howie, Bryant and Tom brought the Frame from block Bay to the sled on a 3-Leaf truck
|
|
|
|
Bryan Boyd used the Broderson loader to set the frame in place.
|
|
|
|
Others returned for drums, fairlead and boiler.
|
|
|
|
Brian Crilly, Chet Fee and Bob McLean help set the frame in place.
|
|
|
|
They installed the drums to complete the May 5 tasks
|
|
|
|
|
On June 22, 3-Leaf contracting moved the restored stack, water tank and skyline block to the sled site
|
|
|
|
With the Broderson Crane, Bryan Boyd lifted the boiler into place, and the team bolted it down.
|
|
|
|
They installed the lower section of the stack next. Bill Tuba welded parts back together.
|
|
|
|
With upper section of the stack installed, the donkey takes it's recognised form
|
|
|
|
Installation of the fairlead on the front of the sled completes the image
|
|
|
Team members for Assembly included Rudi Van Zwaaij, Brian Crilly, Bill Tuba,
Brian Boyd,
Jim Southern, Bob Rourke, Tom Sparks, Howie McKamey, Bryant Gaddes, Bob McLean.