Members installed track in work parties Sep 5 and Sep 11. Thanks to Suzanne Aagaard for the last spike photos Sep 11.
Hmmmmm.... Call the Cops! This is how we got 20' pieces of rail up McLeod road with a 6' bed truck on Sep 5
Dave and Dan added the gravel needed, then installed the switch and the first two two 20' sections of track
Dave Florence wtith the switch which uses metal tubing for ties
P9058475
Dan with the switch on Sep 5
Museum Railway-construction 11-9-11 002
Mike, Cameron
Chet Fee
The trestle adds character to the loop. Two 2x6 sitting on concrete building blocks.
the last spike in eager anticipation
Dan Parsons testing his pedal car
The pedal car is good for testing levelness and bad joints that can de-rail cars
Jerry Oszust, Cameron Bailey, Hans Maurer, Dan Parsons, Chet Fee, Mike Lister
Will Dan hit the spike or Hans' fingers?......
Hans, Jerry, Dan
Stephen James
George Marshall
setting up the posts and ropes for crowd control
P9118587
completing the siding
30' of siding to hold cars not in use