The original Phase 1 230' loop site west of the Archery paddock, which remains part of the 800' track.
FinalTouches
On Sep14, Dan Parsons, Dave Florence, Art Mebs and Mike Lister spread mulch on the areas where sod had been removed to keep dust down and mud from forming after rains
Track Installation
Members installed track in work parties Sep 5 and Sep 11. Thanks to Suzanne Aagaard for the last spike photos Sep 11.
Levelling done - Gravel half done installed
On Sep 3, Dan, Dave, Al, Jerry, George, Barry, and Cameron levelled the site, cleared brush and added 50% of the gravel. On Sep7, Phil, Mike, Hans, Dan and Dave added another half truck load of gravel to widen the track and improve the grade.
Site after first rough clearing
The site mid august after Dan cleared the brush away; and He and Dave Hodgins marked the level with a transit